Chaos in and out
People move goods in and out all shift, but the record of who handled what, and when, is built from memory and paperwork.

Warehouse & Logistics · IP67 Industrial
Your Dock Team Still Scans Every Box Manually.
Hands-free pallet receipt at dock doors, rack reads and location identity across cartons, metal shelving and returnable totes.
Catalogue specifications. Read range depends on the reader, antenna, mounting surface and tag orientation.
Plan your projectPain points on site
Before the pilot, this is the starting point most operations recognise.
People move goods in and out all shift, but the record of who handled what, and when, is built from memory and paperwork.
The inventory report describes the shelf as it was days ago. By the time it reaches a decision, the shelf has already moved on.
Batch, specification and condition never get captured the same way twice, so nobody fully trusts the master record.
The stock is somewhere on the rack. Finding it still means walking the aisle and looking with your own eyes.
Between counts, the system figure and the real count quietly separate, and nobody can say by how much until the next shutdown.
Counting by barcode means line-of-sight on every carton. Most operations can only afford it once or twice a year, so the book figure drifts for eleven months at a time.
Dock loading verified by a person reading labels will always have an error rate. The cost lands later as a customer shortage claim and an emergency reship.
Totes, cages and pallets are assets that walk. Without identity on the container itself, shrinkage stays invisible until the replacement order arrives.
How the solution works
RFID WMS ⇄ ERP
Live dashboard: receiving, outbound, AGV tasks and exception alerts
System rollout
Thirteen steps in the order a warehouse goes through them, with who does each one and how long it usually takes. The WMS integration and the amount of stock already in the building move the date most.
You getScope note, baseline figures and pilot pass marks.
Common mistakeTagging everything at item level from day one. Start where the losses are.
You getSurvey report with read points marked on the floor plan, a process map, an SKU packaging matrix and an interface list.
Common mistakeDesigning from the floor plan alone. Metal doors and racking only show up on site.
You getDesign document, bill of materials, mounting drawings, interface specification, plan and budget.
You getTest report with read rates per product class, final tag specifications, and the list of SKUs that stay on barcode.
Common mistakeTesting empty boxes on a desk.
You getA working test system and an interface test record.
You getEncoded tags with their data file, and the hardware on site.
You getInstalled read points, and location tags bound and photographed.
Common mistakeTags on the back or side of a beam, or where the forks strike.
You getA commissioning record for every read point.
You getTagged stock and an opening balance taken from a physical count.
Common mistakeLoading the old book stock. Every legacy error then shows up as an RFID difference.
You getStaff trained by role, SOPs posted at each workstation.
You getPilot report and a go or no-go decision for the rollout.
You getThe whole site live on RFID.
You getAcceptance report and a maintenance plan.
Tags & hardware
One row for each thing you tag. Sizes and read ranges are catalogue figures; the range you get depends on the reader, the surface and the tag’s orientation.
Cardboard or plastic film
Wood or plastic
Steel beams and uprights
Flat metal surfaces
Washed, stacked, re-used
Nothing flat to stick to
Receiving and packing stations
Prints, encodes and verifies each label in one pass. 203 or 300 dpi, up to 8 in/s.
Dock doors as a portal, or overhead along aisles and lanes
4-port UHF reader, 0-20 m. Antenna positions come from the site survey.
On the conveyor before loading
600+ tags per pass in 3-5 s. Boxes up to 1200×800×800 mm.
Aisles: put-away, counting and search
Android 13. Syncs counts and moves to the WMS over Wi-Fi.
Before we quote
Pick what matches your site. Each answer shows the construction it calls for, and the summary goes to our engineers with your enquiry.
Before a volume order
Each one is cheap to settle on a sample and expensive to fix on a production run.
Tagging every item where a carton or pallet read would do multiplies the label order by the number of items in each carton, with no gain at the dock.
A label approved on an empty box makes the first production batch the real test, on live stock.
An inlay position, label pitch or winding that does not suit the printer means voided labels, or a roll that will not run at all.
Pre-encoded rolls carry the numbering scheme in every tag. Switching from private numbering to GS1 later means new labels for everything already tagged.
Carton and item labels are used up with every shipment. Running out stops RFID at the dock until the next batch arrives.
Related products
Hand-picked from the catalog for this use case, not an automatic industry match. Swipe or use the arrows to see all 12.
Most of the design can be done before anyone travels. Send us:
From that we propose reader positions, antenna counts and tag types, then confirm them with sample reads on your own goods.
Start from the read points, not the floor area. A dock door portal usually takes two to four antennas on one four-port reader. Overhead coverage puts ceiling antennas over the aisles and lanes that matter, spaced from the mounting height and the read range you need, rather than covering the whole building. Metal doors, racking and stacked stock reflect and block the signal, so every layout is confirmed with test reads on site before cabling is fixed.
Yes, and we recommend it. A typical pilot is one dock door plus one aisle, run on live goods for two to four weeks. Measure the read rate on real pallets and cartons, the stray reads, and how exceptions reach your team. Tag samples are tested on your packaging before the pilot starts, so the pilot tests the process, not the tag.
Installing a two-door dock portal takes two to three days on site, and fitting out a whole building one to three weeks. The project as a whole takes longer: from survey to go-live, dock doors plus handheld counting usually take six to eight weeks, and a whole site with WMS integration and existing stock tagged takes three to four months. The WMS integration and the amount of stock already in the building move the date most. The rollout steps on this page show what happens in each stage.
Each fixed reader needs a network connection and power, either PoE from the switch or a local DC supply, depending on the reader. Antennas connect to the reader with coaxial cable. Keep those runs short, because every metre of cable costs read range, and use low-loss cable where a long run cannot be avoided. Mount readers where they can be reached for service, not above the racking.
Placement matters as much as the tag itself:
We mark up a placement guide for your packaging during sampling.
Yes, with the right parts. Check each reader's operating temperature against the space: where the freezer is colder than the rating, mount the reader outside the cold zone and run the antennas in. Freezer labels need a cold-rated adhesive applied before the item goes cold. Outdoor docks need IP65 or better readers and UV-stable tags; the rivet pallet tag is IP68 and rated -40 to +105 °C. Cable connectors are the most common failure point in these areas, so seal them.
Cross-reads are a tuning job, not a hardware fault. In order of effort:
Pallets staged next to the door cause the same problem, so move staging lanes back from the read zone.
Most warehouses use GS1 encodings: SGTIN-96 for items and cases, SSCC-96 for pallets, GRAI for returnable containers and GIAI for fixed assets and locations. You can encode at your own RFID printer as labels print, or we can pre-encode and print serials at the factory and send the number list with the shipment. Lock the EPC memory after encoding if tags must not be rewritten in the field.
Readers report tag events: which tag, which antenna, and when. A middleware layer removes duplicate reads, applies your business rules (this pallet crossed door 3 inbound) and sends the resulting transaction to the WMS through its API, a file drop or a database interface. You do not need to replace the WMS. We document the event format and help map the first transactions; the WMS side is usually handled by your IT team or integrator.
Work from the tag outward:
Most zone problems end with an antenna moved or a different tag type, not new hardware.
These are stray reads, usually from signal reflecting off metal doors, racking or trucks, or from stock parked inside the read zone. Reduce power, re-angle the antennas, trigger reads with a presence sensor, and set a signal-strength threshold in the middleware. Keep a clear lane of a few metres in front of each portal.
Passive UHF tags have no battery, so a tag in service needs no maintenance; replace any that are physically damaged. Fixed readers need firmware updates when released and a yearly check of antenna connectors and brackets. Set the middleware to alert when a reader stops reporting, so a dead reader is found in minutes rather than at the next count. Handheld readers need battery replacement like any mobile device.
Build a matched pilot
We will narrow the construction and sample set around your real operating conditions.
Get the latest news, case studies, and product updates from FYRFID delivered to your inbox. No spam — unsubscribe any time.
Thanks for subscribing — we’ll be in touch.
We couldn't subscribe you right now. Please try again.